
Anturio Construct
Site management in the browser and on the phone, with the real margin in view from budget to close.
- More margin on every project
- Costs that stay on track
- Nothing paid without approval
Edifício Castilho◷ In progressRisk: Medium
OB-2026-014 · Castilho Residências, S.A. · EXE - Construction
Cost Critical
+38.200 €
Final forecast (P50) +65.000 €
Time Good
0 days
Forecast finish 18/12/2026 · planned 18/12/2026
Progress Good
-1 p.p.
Done 60% · planned 61%
Cash Good
+111.586 €
Invoiced 2,9 M€ · actual cost 2,8 M€
Risk Critical
3 open alerts
Assessed risk: Medium · 2 serious
S-curve Calculated on 14/07/2026, 15:20
July 2026Today
Planned61% of total2.964.600 €
Awarded4.470.000 €
Actual cost2.789.640 €
Forecast2.789.640 €
Invoiced2.901.226 €
Actual cost vs planned −5,9%
Below plan-174.960 €
Awarded vs planned +50,8%
Above plan+1.505.400 €
At project completion
Cost budget4.860.000 €
Forecast final cost (P50)4.925.000 €
Contract value5.450.000 €
Over budget+65.000 €
Cost and forecast
Forecast final cost (P50)
4.925.000 €
Overrun expected+65.000 € (+1,3%)
Time and progress
Planned start12/01/2026
Planned finish18/12/2026
Forecast finish18/12/2026
Time elapsed 53%
Procurement and cash
Orders
● Delivered 11● Ordered 14● Pending 3
9:41
Follow one item.
From the estimate to the AI's answer, it is always the same line. Nobody copies sheets between Excel and email.
132 000 kg at 2,00 €, sold at 295 680 €. Imported from Excel with its chapter and code.
Edifício Castilho
| BUDGETED (BASELINE) | SALE + VAR | |||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| WBS | DESCRIPTION | UNIT | QTY | UNIT COST | TOTAL COST | UNIT SALE | TOTAL SALE | QTY + VAR | UNIT. | TOTAL |
| 1 | Site setup | Grou… | 96.000,00 € | 107.654,32 € | 107.654,32 € | |||||
| 1.1 | Site setup and upkeep | vg | 1,00 | 96.000,00 € | 96.000,00 € | 107.654,32 € | 107.654,32 € | 1,00 | 107.654,32 € | 107.654,32 € |
| 2 | Earthworks and retaining | Grou… | 310.000,00 € | 347.612,70 € | 347.612,70 € | |||||
| 2.1 | Bulk excavation and haulage to tip | m³ | 8.875,00 | 16,00 € | 142.000,00 € | 17,94 € | 159.217,50 € | 8.875,00 | 17,94 € | 159.217,50 € |
| 2.2 | Piled perimeter retaining wall | m² | 1.120,00 | 150,00 € | 168.000,00 € | 168,21 € | 188.395,20 € | 1.120,00 | 168,21 € | 188.395,20 € |
| 3 | Foundations | Grou… | 218.000,00 € | 244.465,20 € | 258.370,55 € | |||||
| 3.1 | Pad footings and ground beams | m³ | 1.090,00 | 200,00 € | 218.000,00 € | 224,28 € | 244.465,20 € | 1.090,00 | 224,28 € | 244.465,20 € |
| 3.2 | Foundation strengtheningVariation | vg | 1,00 | 13.905,35 € | 13.905,35 € | |||||
| 4 | Reinforced concrete frame | Grou… | 1.688.320,00 € | 1.892.923,90 € | 1.892.923,90 € | |||||
| 4.1 | Floors 0 and 1 | Grou… | 606.000,00 € | 679.571,50 € | 679.571,50 € | |||||
| 4.1.1 | C30/37 concrete columns | m³ | 1.550,00 | 120,00 € | 186.000,00 € | 134,57 € | 208.583,50 € | 1.550,00 | 134,57 € | 208.583,50 € |
| 4.1.2 | Floor 0 and 1 slabs | m² | 2.100,00 | 200,00 € | 420.000,00 € | 224,28 € | 470.988,00 € | 2.100,00 | 224,28 € | 470.988,00 € |
| 4.2 | Floors 2 and 3 | Grou… | 858.320,00 € | 962.164,40 € | 962.164,40 € | |||||
| 4.2.1 | A500 NR rebar in slabs | kg | 132.000,00 | 2,00 € | 264.000,00 € | 2,24 € | 295.680,00 € | 132.000,00 | 2,24 € | 295.680,00 € |
| 4.2.2 | Slab formwork | m² | 3.950,00 | 40,00 € | 158.000,00 € | 44,86 € | 177.197,00 € | 3.950,00 | 44,86 € | 177.197,00 € |
| 4.2.3 | C30/37 concrete in slabs and beams | m³ | 420,00 | 96,00 € | 40.320,00 € | 107,65 € | 45.213,00 € | 420,00 | 107,65 € | 45.213,00 € |
| 4.2.4 | Floor 2 and 3 slabs | m² | 1.980,00 | 200,00 € | 396.000,00 € | 224,28 € | 444.074,40 € | 1.980,00 | 224,28 € | 444.074,40 € |
| 4.3 | Roof | Grou… | 128.000,00 € | 143.536,00 € | 143.536,00 € | |||||
| 4.3.1 | Roof slab and parapets | m³ | 800,00 | 160,00 € | 128.000,00 € | 179,42 € | 143.536,00 € | 800,00 | 179,42 € | 143.536,00 € |
| 4.4 | Stairs and lift shaft | m³ | 600,00 | 160,00 € | 96.000,00 € | 179,42 € | 107.652,00 € | 600,00 | 179,42 € | 107.652,00 € |
What you gain day to day.
More margin on every project
What goes over budget is seen before it is paid, not at close.
Costs that stay on track
When a cost strays from the forecast, the alert appears at once.
Nothing paid without approval
Valuations, variations and orders only move forward once approved.
+30%
more profit on every project
On a project with a 10% margin, stopping what goes over budget adds 3 points.
−30%
fewer cost overruns
The deviation shows when it happens, in time to correct it.
4×
faster to close valuations
Quantities from the budget, not copied by hand: 3 h becomes 40 min.
- Compare quotes
2 h→ 10 min - Prepare a progress valuation
3 h→ 40 min - Know a project's margin
8 h→ 2 min
Illustrative example, with typical sector values · real figures are measured in the assessment

Ask about the project.
Constelation is the AI in Anturio Construct. It reads the project and answers with its own figures.
Why did the forecast go up? The answer comes with the items, the figures and the sources, in writing or by voice.
Results from day one.
- Construction estimate4.847.600,00 € Planning baseline2.312.320,00 € Construction cost5.450.000,00 € Sales (fixed price)10,8% Construction margin
Edifício Castilho
ActiveBUDGETED (BASELINE) SALE + VAR WBS DESCRIPTION UNIT QTY UNIT COST TOTAL COST UNIT SALE TOTAL SALE QTY + VAR UNIT. TOTAL 1 Site setup Grou… 96.000,00 € 107.654,32 € 107.654,32 € 1.1 Site setup and upkeep vg 1,00 96.000,00 € 96.000,00 € 107.654,32 € 107.654,32 € 1,00 107.654,32 € 107.654,32 € 2 Earthworks and retaining Grou… 310.000,00 € 347.612,70 € 347.612,70 € 2.1 Bulk excavation and haulage to tip m³ 8.875,00 16,00 € 142.000,00 € 17,94 € 159.217,50 € 8.875,00 17,94 € 159.217,50 € 2.2 Piled perimeter retaining wall m² 1.120,00 150,00 € 168.000,00 € 168,21 € 188.395,20 € 1.120,00 168,21 € 188.395,20 € 3 Foundations Grou… 218.000,00 € 244.465,20 € 258.370,55 € 3.1 Pad footings and ground beams m³ 1.090,00 200,00 € 218.000,00 € 224,28 € 244.465,20 € 1.090,00 224,28 € 244.465,20 € 3.2 Foundation strengtheningVariation vg 1,00 13.905,35 € 13.905,35 € 4 Reinforced concrete frame Grou… 1.688.320,00 € 1.892.923,90 € 1.892.923,90 € 4.1 Floors 0 and 1 Grou… 606.000,00 € 679.571,50 € 679.571,50 € 4.1.1 C30/37 concrete columns m³ 1.550,00 120,00 € 186.000,00 € 134,57 € 208.583,50 € 1.550,00 134,57 € 208.583,50 € 4.1.2 Floor 0 and 1 slabs m² 2.100,00 200,00 € 420.000,00 € 224,28 € 470.988,00 € 2.100,00 224,28 € 470.988,00 € 4.2 Floors 2 and 3 Grou… 858.320,00 € 962.164,40 € 962.164,40 € 4.2.1 A500 NR rebar in slabs kg 132.000,00 2,00 € 264.000,00 € 2,24 € 295.680,00 € 132.000,00 2,24 € 295.680,00 € 4.2.2 Slab formwork m² 3.950,00 40,00 € 158.000,00 € 44,86 € 177.197,00 € 3.950,00 44,86 € 177.197,00 € 4.2.3 C30/37 concrete in slabs and beams m³ 420,00 96,00 € 40.320,00 € 107,65 € 45.213,00 € 420,00 107,65 € 45.213,00 € 4.2.4 Floor 2 and 3 slabs m² 1.980,00 200,00 € 396.000,00 € 224,28 € 444.074,40 € 1.980,00 224,28 € 444.074,40 € 4.3 Roof Grou… 128.000,00 € 143.536,00 € 143.536,00 € 4.3.1 Roof slab and parapets m³ 800,00 160,00 € 128.000,00 € 179,42 € 143.536,00 € 800,00 179,42 € 143.536,00 € 4.4 Stairs and lift shaft m³ 600,00 160,00 € 96.000,00 € 179,42 € 107.652,00 € 600,00 179,42 € 107.652,00 € 01Import the estimate.
The bill of quantities comes in from Excel with chapters and items. The AI helps classify and validate it.
Project programmeEdifício Castilho
In progressProgramme: Edifício CastilhoPROG. WBSEST. WBSACTIVITYDUR.%2026JanFebMarAprMayJunJulAugSepOctNovDec11SITE SETUP AND PREPARATORY WORKS26d100%1.11.1Site setup12d100%1.21.2Setting out and staking5d100%1.31.3Site hoarding and signage12d100%22EARTHWORKS40d100%2.12.1Bulk excavation26d100%2.22.2Perimeter retaining26d100%33FOUNDATIONS47d100%3.13.1Pad footings and ground beams33d100%3.23.2VARFoundation strengthening (TM-014)12d100%44STRUCTURE138d64%4.14.1Columns and slabs, floors 0 and 140d100%4.24.2Floor 2 and 3 slabsFormwork crew A40d100%4.34.3Floor 4 slab and roofFormwork crew ATower crane GT-0140d40%4.44.4Stairs and lift shaft40d10%55MASONRY AND INSULATION89d8%5.15.1External masonryMasonry crew B54d12%5.25.2External thermal insulation47d0%02Plan the works.
The approved estimate becomes the baseline. The programme is built here or comes from MS Project.
Bid comparison
RFQ-018 - Aluminium window frames and glazing
TOTAL AWARDED 360.844,00 €-156,00 € vs estimateWBSDESCRIPTIONUNITQTYESTIMATETotal: 361.000,00 €Alumínios do Oeste, Lda. #1Final total: 364.314,50 €Delivery and lifting on site 1.850,00 €Caixilharia Norte, S.A. #2Final total: 364.896,00 €Delivery and lifting on site 2.400,00 €Trims and sealants 3.100,00 €Fachadas Atlântico, Lda. #3Final total: 370.452,00 €AWARD6.1.1Thermally broken aluminium casement windowsm²352452,00 €159.104,00 €6.1.2Thermally broken aluminium sliding doorsm²198418,00 €82.764,00 €6.1.3Fixed glazing in common areasm²60442,20 €26.532,00 €6.2.16+16+4 solar control double glazingm²463200,00 €92.600,00 €TOTALS361.000,00 €364.314,50 €vs estimate: +3.314,50 €364.896,00 €vs estimate: +3.896,00 €370.452,00 €vs estimate: +9.452,00 €360.844,00 €03Tender and award.
Bids side by side against the estimate, and each line awarded to whoever makes sense.
- Progress Measurements6 Valuations in progress389.700,00 € Period value2.111.000,00 € Actual sales executed1.721.300,00 € Certified YTD
Edifício Castilho, AM-006
DraftVALUATIONValuation #6 · 10/07/2026 MEASUREMENTSESTIMATE LINES IN VALUATION AM-006 · the “Current valuation (qty)” column is editable
ESTIMATE MEASURED (APPR.) REMAINING PRODUCED CURRENT VALUATION (EDITABLE) FINAL ACTIVITY DESCRIPTION UNIT QTY VALUE QTY VALUE QTY VALUE QTY QTY VALUE OUTSTANDING VALUE Site setup 107.654,32 € 51.674,07 € 7.535,80 € 48.444,44 € Site setup and upkeep vg 1,000 107.654,32 € 0,480 51.674,07 € 0,520 55.980,25 € 0,700 7.535,80 € 0,450 48.444,44 € Reinforced concrete frame 1.213.352,40 € 460.172,52 € 271.814,73 € 481.365,15 € A500 NR rebar in slabs kg 132.000,000 295.680,00 € 46.699,570 104.607,04 € 85.300,430 191.072,96 € 105.600,000 79.568,92 € 49.778,590 111.504,04 € Slab formwork m² 3.950,000 177.197,00 € 1.618,870 72.622,51 € 2.331,130 104.574,49 € 3.160,000 37.751,48 € 1.489,590 66.823,01 € C30/37 concrete in slabs and beams m³ 420,000 45.213,00 € 75,610 8.139,42 € 344,390 37.073,58 € 260,400 13.686,62 € 217,250 23.386,96 € Floor 2 and 3 slabs m² 1.980,000 444.074,40 € 1.225,270 274.803,56 € 754,730 169.270,84 € 1.980,000 70.957,71 € 438,350 98.313,14 € Roof slab and parapets m³ 800,000 143.536,00 € 0,000 0,00 € 800,000 143.536,00 € 320,000 44.704,29 € 550,840 98.831,71 € Stairs and lift shaft m³ 600,000 107.652,00 € 0,000 0,00 € 600,000 107.652,00 € 180,000 25.145,71 € 459,850 82.506,29 € Masonry and insulation 208.568,00 € 0,00 € 40.598,43 € 167.969,57 € External thermal brick masonry m² 2.480,000 208.568,00 € 0,000 0,00 € 2.480,000 208.568,00 € 620,000 40.598,43 € 1.997,260 167.969,57 € Building services and equipment 1.083.271,61 € 209.432,51 € 69.751,03 € 804.088,07 € Electrical and telecoms installations vg 1,000 462.016,46 € 0,270 124.744,44 € 0,730 337.272,02 € 0,450 36.961,32 € 0,650 300.310,70 € Water supply and drainage vg 1,000 264.650,21 € 0,320 84.688,07 € 0,680 179.962,14 € 0,500 18.525,51 € 0,610 161.436,63 € HVAC and ventilation vg 1,000 356.604,94 € 0,000 0,00 € 1,000 356.604,94 € 0,050 14.264,20 € 0,960 342.340,74 € 04Measure the works.
Valuations are logged against the estimate lines: measured, remaining and produced in plain sight.
Approval status
What was submitted for approval, exactly as recorded.
STATUS
Submitted for approvalREFERENCE
VAR-0016 · Extra roof waterproofingPROJECT
Edifício CastilhoSUBMITTED ON
07/07/2026, 17:42SUBMITTED BY
James CooperRULE APPLIED
Variations above 5 000 €APPROVAL MODE
SequentialCURRENT STAGE
#2REVISION
#2Who approves
Mary Fisher (Project manager) · stage 1 · 08/07/2026, 10:30ApprovedSite supervisor · stage 2Submitted variation details Immutable snapshot of the submission
CODE
VAR-0016TITLE
Extra roof waterproofingDATE
07/07/2026TYPE
ActivityOWNER
Mary FisherTIME IMPACT (DAYS)
3ORIGIN
Design changeADDITIONAL COST
+8949,00 €DESCRIPTION
Extra membrane and reinforced flashings requested by the supervisor after the watertightness test.
Close05Approve by the rules.
Variations, valuations and orders go through the workflow, up to the supervisor and the client.
- Cost forecast (EAC)4.860.000 € Estimate1.383.280 € Market exposure07/26 Reference month
Edifício Castilho
FINAL FORECAST (P50)
4.925.000 €
↗ +65.000 € (+1,3%)
P20P50P804.868.000 €4.991.000 €FINAL COST BREAKDOWN 4.925.000 €
WHEN TO BUY
08/2609/2610/2611/26MAIN CAUSES +65.000 €
Cost lines 13Cost curveDrivers and indicesSnapshots 6Cost line Family Estimate Exposed Forecast Variance Site setup and upkeep1.1 Other 96.000 € 0 € 96.000 € 0 € Bulk excavation and haulage to tip2.1 Fuel 142.000 € 0 € 142.000 € 0 € Piled perimeter retaining wall2.2 Concrete 168.000 € 0 € 168.000 € 0 € Reinforced concrete footings and ground beams3.1 Concrete 218.000 € 0 € 221.100 € +3.100 € Foundation strengthening (TM-014)3.2 Concrete 12.400 € 0 € 12.400 € 0 € C30/37 concrete columns4.1.1 Concrete 186.000 € 0 € 190.600 € +4.600 € Floor 0 and 1 slabs4.1.2 Concrete 420.000 € 0 € 420.000 € 0 € A500 NR rebar in slabs4.2.1 Steel 264.000 € 112.000 € 270.800 € +6.800 € Aluminium window frames and glazing6.1 Window frames 361.000 € 361.000 € 369.800 € +8.800 € Lifts7.4 Imported 238.000 € 238.000 € 238.000 € 0 € Tower crane GT-019.1 Plant 128.000 € 128.000 € 128.000 € 0 € In-house structure crews10.1 Labour 412.000 € 0 € 412.000 € 0 € HVAC and ventilation8.3 Subcontracts 356.600 € 356.600 € 356.600 € 0 € 06See the outturn early.
The project's forecast final cost and what pushed it up or down.
Anturio Construct drawn from its real screens, with a fictional project. Try it: click, edit, award.
Site work recorded on the spot, paper-free.
The same account and the same data, on Android and iPhone. The foreman logs the day, management asks the AI.
Download the app9:41
Work diaryPending tasks, approvals and the day's figures
9:41
9:41
Work doneToday · Edifício Castilho
25Lines
7044Today
47%Progress
0Attention
9:41
Incident logToday · Edifício Castilho
4Records
2High
1Attachments
9:41
The last 24 hours across all projects, in one paragraph, with the alerts.
The sectors where it counts most.

Want to see your projects in Construct?
We show you Anturio Construct with one of your own estimates, from planning to cost forecast.

